BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 10, 2026 at 8:00 PM

Updated August 14, 2026

Site work, paving, outdoor lighting and new construction of a mixed-use development in Clanton, Alabama. Completed plans call for the construction of a transportation facility; transportation facility; for site work for a transportation facility; transportation facility; for paving for a transportation facility; transportation facility; for outdoor lighting for a transportation facility; and transportation facility.

Water and sewer relocations, site grading with remediation of unsuitable soils, installation of new drainage structures, 1,000-foot extension of Runway 8 using crushed aggregate base course and new bituminous asphalt pavement, installation of new airfield lighting system components, application of new runway markings, and installation of airfield perimeter fencing. Bonds: Bid Bond required (unspecified amount), Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). QA date - 7-10-2026 2:30 PM Questions should be submitted in writing to Jennifer Harp JHHarp@GarverUSA.com 256-527-4121

Bid Results

$4,060,321.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
48
Bidding Soon
815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2026

September 14, 2026

Project location map

702 Airport Rd, Clanton, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.