Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 26, 2026 at 8:00 PM
Updated July 8, 2026
Renovation of a mixed-use development in Northampton, Massachusetts. Completed plans call for the renovation of a three-room medical facility.
Provide professional services to include all labor, transportation, materials, apparatus, tools, equipment, and permits necessary to replace HVAC components in Building 2 TeleHealth Rooms at Central Western Massachusetts VAMC. The work involves procuring and replacing all components, compressors, cassettes, line sets, controls, etc., to replace one split-system heat pump system supporting four Telehealth rooms, with the new system to support only Rooms 109, 113, and 120. Dispose of the cassette in the hallway and all associated components. Meet with VA Facilities staff to review drawings and perform field work as needed. All work must comply with VHA, OSHA, EPA, and Mass DEP standards. Schedule field work at least 72 hours in advance, maintain a clean work site, coordinate removal of waste refrigerant, ensure the design and installation meet NEC and NFPA standards, and submit shop drawings and product data for approval. Supply all necessary tools, parts, labor, travel, and equipment for removal and installation of new equipment, implement proper LOTO procedures, repair any damages, and adhere to Massachusetts DEP and DLS regulations and OSHA codes. Determine appropriate sizing and capacity, provide required documentation, disconnect power, recover and dispose of refrigerant, remove old equipment, install new systems, charge with new refrigerant, test and provide a report of proper functionality to the COR. Contractors must manage all aspects of their work, obtain and wear a contractor badge, comply with parking restrictions, and meet all site access and safety requirements including ICRA barriers and maintaining clear paths. All penetrations of fire and smoke barriers must be approved and restored to original standards after work. The cut-off date and time for receipt of questions is 3-JUL-2026 by 10:00 AM EST. Questions shall be submitted to the Contracting Officer in writing via e-mail juliette.buchanan@va.gov. Oral questions are not acceptable due to the possibility of misunderstanding or misinterpretation. The cut-off date and time for receipt of questions Questions received after this date and time may not be answered. Questions shall be answered in a formal amendment to the solicitation so all interested parties can see the answers
Sub-Bidding
$10,000,000.00
Public - Federal
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
421 N Main St, Northampton, MA
Related To This Project
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
--
Northampton, MA
Bid Date: Jul 01 2026
Northampton, MA
Bid Date: Jun 26 2026
Northampton, MA
Bid Date: Jun 25 2026
Northampton, MA
--
Northampton, MA
Bid Date: Jun 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
