Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2026 at 8:00 PM

Updated August 3, 2026

Renovation of an industrial development in Lackland AFB, Texas. Completed plans call for the renovation of a industrial development.

This project involves the procurement, installation, and electrical integration of two 20' x 20' Cornell Iron Works Model ESD10 (or brand-name equivalent) interior coil weathered service doors at Building 2079, JBSA Lackland. The installation requires doors with a 22-gauge galvanized steel curtain, standard gray factory finish, extruded mill-finish aluminum bottom bar with astragal, lintel brush seal, single-guide weathering, motor operation with photo-eye safety sensors, and a 20 PSF wind load rating. The contractor must also install a dedicated 120-Volt, 20-Amp circuit to each motor, set and hardwire a disconnect at each motor, pipe conduit for the control switches and motion sensors, and pull all necessary control wiring. A comprehensive 3-year warranty on both parts and labor is required. Interested vendors shall respond in accordance with the attached documents and instructions to offerors. Refer to each attachment for additional details and Addendum to RFO 52.212-1 for proposal preparation and format instructions. All questions must be submitted in writing through email no later than 16 July 2026 at 12:00 p.m CDT.

Post-Bid

$10,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
88
Bidding Soon
2,214
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2026

September 25, 2026

Project location map

1875 Arizona St, Lackland AFB, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed