BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2026 at 8:00 PM

Updated July 9, 2026

Site work for a data center facility in Abilene, Texas. Completed plans call for site work for a data center facility.

EFI&T New Fiber Optic Cable from ITB 7320 to CN 7318. The Contractor shall provide all equipment, materials, supplies, transportation, supervision, management, labor, and other incidentals necessary to complete work in accordance with the attached statement of work. Your offer shall include a complete signed pricing sheet (or contractor equivalent) and a Technical Plan as described in Instructions to Offerors. Email is the required method of submission; no other form will be considered for award. Deadline for Questions pertaining to this solicitation: Questions shall be sent to the email address trevor.finch.1@us.af.mil, NLT 10 July 2026, 1:00 p.m. (CDT). 1. Install approximately 700 feet of new 24-strand Single-Mode Fiber Optic Cable (FOC) from ITB7320 to CN7318. 2. Install approximately 600 feet of 4-inch PVC/HDPE conduit and 3-cell geotextile innerduct (Maxcell) between MH-M0134 and HH-H0172, including one new precast concrete 4'x4'x4' Handhole. 3. Perform fiber testing in accordance with TIA 526-7-A. 4. Terminate cable using core alignment fusion splicing at new 24-Port Fiber Optic Distribution Panels (FODP) with LC connectors in both buildings. 5. Deliver final PDF As-Builts, butterfly drawings, and GIS shape files (with GPS accuracy of +/- 3 feet) within 30 days of completion." 6. Confirm that the project can be completed withing 90 DAYS after award (or sooner). Installation Requirements o The Contractor shall EF&I one new Handhole (HH). o The contractor shall EF&I approximately 600 feet of 1, 4-inch PVC/HDPE conduit and approximately 600 feet of 1-Pck (3-Cell) geotextile fabric innerducts between MHM0134, New HH and HH-H0172. o The Contractor shall EFI&T approximately 700 feet of 24-St, SM FOC from ITB7320 to CN7318. o The contractor shall provide all necessary equipment/materials required to perform these installations. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards. All equipment, supplies, and materials provided shall be new and not refurbished. Existing MH/HH (Manhole/Handhole). Proposed new HH. Existing Conduit/Innerducts/Geotextile Innerducts. Proposed new 1, 4-Inch Conduit and new 1-Pack, total of 3-Cellgeotextile Innerducts. T-Walls, will be removed by the base. The Conduit route/path and HH placement location shown on this sketch is for recommendation The installer is free to make any adjustment upon base approval.

Sub-Bidding

$10,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
9
Bidding Soon
256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.