BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 21, 2026 at 8:00 PM

Updated July 30, 2026

Site work and outdoor lighting for a playground / park / athletic field in Red Deer, Alberta. Completed plans call for outdoor lighting for a playground / park / athletic field; and for site work for a playground / park / athletic field.

The City of Red Deer owns and operated numerous timber structures throughout the city’s expansive trail system. Three structures have been identified as requiring replacement: boardwalk behind Checkmate Hill, boardwalk in Maskepetoon Park, and staircase at Riverview Avenue. In conjunction with the staircase work at Riverview Avenue, asphalt trail realignment and installation of trail lighting is planned as part of this project. Documents can be obtained from https://reddeer.bidsandtenders.ca/ Question Deadline 07/21/2026 at 1:30 PM MT

Post-Bid

$100,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
11
Bidding Soon
269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2026

September 1, 2026

Project location map

Multiple Locations, Red Deer, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.