Published July 13, 2026 at 8:00 PM

Updated July 15, 2026

Site work and new construction of a water / sewer project in Cornwall, New York. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Question Deadline 07/17/2026 Every request for such interpretation should be in writing addressed to Pitingaro & Doetsch Consulting Engineers, P.C. 15 Industrial Drive, Suite 2, Middletown NY 10941 , and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids. The project consists of the following 1. Coordination with the Village of Cornwall-on-Hudson Mayor and/or his designatee. 2. Installation of water mains, valves, and appurtenances as follows. Furnish and Install 150 Linear Feet of 10-Inch Ductile Iron Pipe (DIP) Water Main, including 41 LF of insulated Water Main. Furnish and install 10" Water Main Fittings as shown on the Plans. Furnish and install three (3) brackets and clamps along the Canterbury Brook Bridge as shown on the Plans. Furnish and install a 10" insertion valve on Continental Road as shown on the Plans. Furnish and install a 16" x 10" wet tap and 10" gate valve on the existing 16- inch water main on Boulevard. Furnish and install all thrust restraint and necessary appurtenances. 3. This work includes excavation, bracing and support of adjoining ground or structures where necessary, handling all drainage and groundwater conditions, protection from damage of all existing utilities, replacing all damaged drain, sewer and waterlines or other damaged services or structures, traffic maintenance and safety, guarding the site, unloading, hauling, distributing and laying pipes, cleaning up the site, testing the waterlines for pressure and leakage, disinfecting waterlines and maintaining the streets and other surfaces over the trenches. 4. The Contractor shall obtain a Highway Work Permit and provide all labor, supervision, materials, equipment, tools, utilities, and incidentals necessary to complete the Work as specified in the Technical Specifications and as shown on the Plans. The project consists of the following Coordination with the Village of Cornwall-on - Hudson Mayor and/or his designatee. Installation of 150 LF of 10-inch ductile iron water main, including insulation, fittings, support brackets and clamps on bridge, insertion valve, and wet tap. Work includes excavation, bracing, utility protection, traffic maintenance, pipe laying, pressure testing, disinfection, and site restoration. Bonds: 5% Bid Bond, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount).

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,087
Active Projects
47
Bidding Soon
7,922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Cornwall, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.