BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2026 at 8:00 PM

Updated August 2, 2026

Site work and renovation of a road / highway in Clinton, Pennsylvania. Completed plans call for the renovation of a road / highway; and for site work for a road / highway.

Stabilization of approximately 425 lineal feet of the slope along and below Camp Meeting Road and above a tributary to Raredon Run through the use of soil nails. Bonds: 10% Bid Bond, Certified Check required. QA date - 7-22-2026 Questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to parties recorded by Engineer as having received the Contract Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered.

Post-Bid

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
168
Bidding Soon
3,433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2026

August 26, 2026

Project location map

1271 Route 30, Clinton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.