Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Site work and renovation of a mixed-use development in Grise Fiord, Nunavut. Completed plans call for the renovation of a power facility; and for site work for a power facility.
Grise Fiord is getting a new Water Treatment Plant (WTP) with anticipated total completion in 2027. The new WTP will be located on the west side of the power plant and as per the QEC distribution mapping, and it will be fed through the existing distribution feeder 1 going east towards town. However, the current load carrying capacity of existing primary Feeder 1 is 225 kVA (3 x 75 kVA, 600/2400V) substation step up transformer bank. Therefore, with the addition of WTP's 172.1 kVA load, there is need to upgrade the existing substation bank to 3 x 167 kVA (600/2400V) bank to avoid feeder overloading and unplanned outages due to WTP load. Objectives and outcomes include installation of QEC provided 3 x 167KVA pole mounted transformer bank on Feeder 1, along with upgrade underground cable from the power plant switchgear unit to the transformer bank of Feeder 1; as well as upgrade the cut-out fuses, transformer low voltage (LV) down lead, overhead LV bus, 15KV, 300A solid blade cutout, and fuses of 27KV disconnect switch to be upsized to account for increased ampacity of new transformer bank, as per Schedule A, Appendix B – Stantec Memo dated June 2, 2026 Grise Fiord Feeder 1 upgrade.
GC Bidding
$250,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Grise Fiord, Grise Fiord, NU
Related To This Project
Grise Fiord, NU
Bid Date: Jul 31 2025
Grise Fiord, NU
Bid Date: Jun 13 2025
Grise Fiord, NU
Bid Date: May 14 2025
Grise Fiord, NU
Bid Date: Feb 26 2025
Grise Fiord, NU
Bid Date: Jun 19 2024
Grise Fiord, NU
Bid Date: May 21 2024
Grise Fiord, NU
Bid Date: Sep 12 2024
Grise Fiord, NU
Bid Date: Mar 11 2024
Grise Fiord, NU
Bid Date: Mar 29 2022
Grise Fiord, NU
Bid Date: Sep 25 2023
Grise Fiord, NU
Bid Date: Apr 03 2023
Grise Fiord, NU
Bid Date: Feb 20 2025
Grise Fiord, NU
Bid Date: May 06 2022
Chesterfield Inlet, NU
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.