Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 27, 2026 at 8:00 PM
Updated July 7, 2026
Site work and new construction of a water / sewer project in Hastings, Minnesota. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The Project includes the furnishing of all labor and materials for the construction complete in-place of the Eastern Water Treatment Plant, a granular activated carbon (GAC) and ion exchange (IX) drinking water treatment plant for per- and polyfluoroalkyl substances (PFAS) and Nitrate removal. The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response submission to the Advertisement for Bids of the City of Hastings shall comply with the provisions of the statute. Bids will only be accepted via the electronic bidding service through QuestCDN. The City Council reserves the right to reject any and all bids and to waive any bids received without explanation. No bid may be withdrawn for a period of 60 days. The Bidder as a company shall have experience as a general contractor in the successful construction of at least three (3) municipal potable water treatment plants with a minimum treatment capacity of three million gallons per day (3 MGD) within five (5) years prior to the bid opening date. This treatment plant construction experience must include furnishing and installing all of the following from the ground up: a new building, filtration, chemical feed systems, process piping and valves, pumps, and electrical instrumentation and controls. Wastewater treatment plant construction experience does not meet the minimum contractor qualifications specified herein. The designated process mechanical and electrical subcontractors must also meet the above stated requirements for their portions of the work on this project. The granular activated carbon (GAC) adsorption pressure filter vessel system manufacturer and ion exchange (IX) pressure filter vessel system manufacturer shall have experience in the successful fabrication of vessels for at least three (3) municipal potable water treatments plants with a minimum treatment capacity of one million gallons per day (1 MGD) within five (5) years prior to the bid opening date.
GC Bidding
$15,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
To Be Determined, Hastings, MN
Related To This Project
Hastings, MN
--
Hastings, MN
Bid Date: Jul 09 2026
Hastings, MN
Bid Date: Jun 25 2026
Hastings, MN
Bid Date: Jun 25 2026
Hastings, MN
Bid Date: May 20 2026
Hastings, MN
Bid Date: Apr 30 2026
Hastings, MN
Bid Date: Apr 30 2026
Hastings, MN
Bid Date: May 19 2026
Hastings, MN
Bid Date: May 28 2026
Hastings, MN
Bid Date: Apr 06 2026
Hastings, MN
Bid Date: Apr 22 2026
Hastings, MN
Bid Date: Apr 10 2026
Hastings, MN
Bid Date: Apr 08 2026
Hastings, MN
Bid Date: Mar 19 2026
Hastings, MN
Bid Date: Mar 19 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
