BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2026 at 8:00 PM

Updated July 9, 2026

Site work and renovation of a water / sewer project in Hagerstown, Maryland. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Improvement of wastewater treatment plant infrastructure to address aging equipment and facilitate compliance with nitrogen and phosphorous discharge limits and permit requirements. Question Deadline 07/17/2026 at 3:00 PM ET Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda delivered to all registered plan holders. Any questions received after that date may not be answered. This project will address aging infrastructure and facilitate meeting of nitrogen and phosphorous limits as well as all other quantified permit requirements. The proposed WWTP improvements will improve water quality of the receiving streams while maintaining the existing WWTP treatment capacity, facilitate plant reliability in meeting permit limits and does not address growth. Replacement of existing influent screens and washer compactors. Installation of a building to enclose the headworks to increase reliability and compliance limits for NPDES thermal requirements Replacement of 2 In-Plant pumps and related sluice gate which will improve flow diversion to avoid overloading the nutrient removal basins Replacement of 3 RAS pumps for return of adequate activated sludge to nutrient removal basins and addition of a WAS pump to Final Clarifier No. 1. Operations Building Sanitary Grinder Pump Station. Modification of the Primary Sludge Pump discharge piping New Chemical (ferric chloride/alum) storage tank and appurtenances in dedicated building Replacement of dry type substation transformers and primary switches, motor control centers, PLCs, and switchboard, and miscellaneous electrical equipment for increased reliability and resiliency Addition of a nitrate probe to the BNR basins. Miscellaneous building and structural improvements; including HVAC equipment, roof, stairways, doors, and windows for safety and energy efficiency improvements. 121.2 k. Repair of cracking and spalled concrete at Headworks

GC Bidding

$1,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
72
Bidding Soon
3,572
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

1 Clean Water Cir, Hagerstown, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.