BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 12, 2026

Renovation of a municipal facility in Orlando, Florida. Completed plans call for the renovation of a municipal facility.

Administration Center HVAC Chiller Plant Upgrades. Orange County, Florida is accepting sealed bids for Administration Center HVAC Chiller Plant Upgrades (Y26-753). The estimated cost for this project is $3,000,000.00. Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Hand-delivered, mailed, telephoned, faxed, or emailed offers are not permitted. Responses submitted after the deadline or outside the designated platform will be rejected. Question Deadline 07/15/2026 at 5:00 PM ET Question submitted online To replace the equipment in the chiller plant with new high efficiency chillers, and variable primary pumping system . Mechanical: HVAC Chiller Plant Upgrades 1 . 2. The intent is to replace the equipment in the chiller plant with high efficiency chillers, variable primary pumping system. Cooling towers have been replaced under another project phase. Removal of three existing chillers , primary pumps and condenser water pumps, secondary pumps, VFDs, piping, valves, plumbing and electrical. 3. Provide new high efficiency chillers, variable primary pumping system, condenser water pumps, VFDs, piping , valves, plumbing, electrical and all other appurtenances necessary to maintain redundancy, reliability, performance and efficiency. Installation of a new water treatment system to maintain and or increase water efficiency in the existing chilled water and cooling tower system. 4. 5. 6. 7. Provide new chiller controllers compatible with existing building automation system. Test, adjust and balance the new system; Electrical switchgear and MCC for the chillers shall be evaluated to determine their condition for repair, refurbish, upgrade or replacement. Improvements shall be included in the project. Provide Fan Coil unit to provide conditioning for CEP. 8. Provide new refrigerate monitoring within CEP. Sustainability 1. Identify opportunities for integrated design and construction with respect to best energy and environmental practices within the scope of work and include them into the project. Electrical: 1 . Power to support the replacement HVAC equipment

Sub-Bidding

$3,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
45
Bidding Soon
2,700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.