Published July 10, 2026 at 8:00 PM

Updated July 12, 2026

Renovation of a military facility in Lackland AFB, Texas. Completed plans call for the renovation of a 2,610-square-foot, two-room military facility.

The Joint Electromagnetic Warfare Center at Bldg. 1003, 1301 Billy Mitchell Rd, JBSA-Lackland, San Antonio, Texas 78236, requires installation of an Access Control System (ACS) and Intrusion Detection Systems (IDS) inclusive of a Video Management Server with cameras (VMS). The Contractor shall provide all equipment and tools, necessary to provide and install a Honeywell Vindicator IDS and ACS to secure multiple rooms area at JBSA Lackland-Kelly Annex Bldg. 1003. B1003 is approximately 2610 SF; it is comprised of 2 Rooms, a high bay area, 2 restrooms, and a mechanical room. Reference the combo synopsis/solicitation for instructions, evaluation factors, and its attachments. Lackland-Kelly Annex Bldg. 1003 Doors (BMS): Primary (#1) Entry door at end of the main corridor, interior door (#2) Office Workspaces, and Mechanical Room double doors (#3#4): Door #1 interior Premise control reader ( PCR) to disable BMS and PIR in workspaces upon renovation. Install Premise control reader Door #2 interior office to disable workspace - Upon renovation Door #1 Install Card Reader (ACR) (linked to electric door locksets electromagnetic switches) and Access Control Panel (ACP), Balanced Magnetic Switches (BMS) and all cabling required, within 1" Conduit with pull- string and a back- box from locations designated on provided drawings. Install Surveillance Camera, one each at elevation with tilt and pan feature viewing exterior entryway inclusive of all cabling back to CCTV location. Route within 1" Conduit with pull-string and a back-box from locations designated on provided drawings. Surveillance Camera viewing area and all cabling back within 1" Conduit provided with pull-string and a back-box to CCTV location and linked to Video Verification Screen (VVS) at Door # 1. All questions must be submitted in writing by email no later than Monday, 11:00 AM CDT, 6 July 2026. Response to questions will be posted by the Government on SAM.gov, contracting opportunities website as received. Questions submitted after this date/time will not be considered unless determined by the Contracting Officer. 90 days ARO SCOPE: The contractor must be Honeywell Vindicator(R) certified and perform the following services for the installation in a phased process, with Vindicator certified alarm components and associated equipment. I. Install Vindicator 1500 or Vindicator(R) V5. II . Install Vindicator Keypads for entry into Bldg. 1003 III. Install Balanced Magnetic Switch (s) ( BMS) and Passive Infrared sensor(s) ( PIR) at each access point. IV. Install battery backup lasting no less than 4 hours. V. Label wiring before and after penetration of perimeter walls of alarmed areas. VI. Install all electrical support requirement for equipment that is not already available. Install dedicate electrical and communication lines from point of debark. VII. Remove all previous installed components that are identified as unnecessary. VIII. Coordinate all programming of the Vindicator system and map of the area(s) with 802 SFS/Electronic Security Systems (ESS). All alarm programming at the headend will be conducted by 802 SFS/ESS in coordination with contactor at Building # 1030 for data transmissions through dedicated conductors, and Base Level Information Infrastructure (BLII ) VIIII. Provide an area PDF drawing that shows all designated alarm points that will be programmed into the base alarm system; this will be reviewed by 802 SFS/Resource Protection and the 802 SFS/ESS during material submittals IAW this SOW. X. Provide a complete list of alarm devices to 802 SFS/Resource Protection and 802 SFS/ESS which will be reviewed during the material submittals. To include make, model, serial number and part number. XI. Coordinate with 802 SFS/ESS for Vindicator alarm point numbers for programming after installation is complete; this will also be provided to 802 SFS/ESS as a hard copy and electronic copy. XII . After installation but before alarm programming, 802 SFS/ESS will conduct an inspection of the installed parts. XIII. Ensure each alarm device will have its own alarm point. XIV. Provide a plan for a Vindicator(R) certified technician to conduct warranty response within 24 hours from a call requesting warranty support. XV. Ensure all IDS data transmission lines shall be protected with a National Institute of Standards and Testing ( NIST) certified Advanced Encryption Standard (AES) encryption. XVI. Coordinate with the 802 SFS/ESS on the installation of mounted alarm boxes and fiber cables/Copper pairs prior to installation, or when within 80 percent of completion to ensure correct placement of equipment.

Post-Bid

$10,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
18
Bidding Soon
2,552
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

Multiple Locations, Lackland AFB, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.