Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 6, 2026 at 8:00 PM
Updated July 8, 2026
Site work for a water / sewer project in Rockford, Illinois. Completed plans call for site work for a water / sewer project.
City Wide Drainage Repair Package 1 - The City of Rockford requests bids from qualified companies to provide all labor, materials, equipment, and supplies necessary for the City-Wide Drainage Repair Package 1 as described in these specifications. The work consists of repairing a box culvert outlet structure in Keith Creek south branch near the Magna parking lot and replacing damaged concrete panels in the Buckbee Channel near 25th St. Each bidder shall submit with his bid the information specified in the bid documents for compliance with the laws of the State of Illinois on Fair Employment Practices and with the City of Rockford's Ordinance on Equal Employment and Business Opportunity. Any bid which fails to include the compliance items properly completed will not be read and will not be considered. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) . The City of Rockford reserves the right to accept or reject any and all proposals and to waive technicalities . Question Deadline 07/10/2026 at 12:00 PM CT Questions regarding this Bid/RFP shall be addressed to: Vishruti Patel vishruti.patel@rockfordil.gov. Answers to questions will be posted on the City's website in the form of an addendum no later than July 13, 2026 at 5:00 p.m. BIDS SUBMITTED BY FASCSIMILE OR E-MAIL WILL NOT BE ACCEPTED When required on the cover sheet, a bid bond for not less than five (5) percent of the bid amount must accompany all bids as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract. A bank cashier's check, bank draft, or certified check equal to the amount specified is acceptable in lieu of a bid bond. Bid bonds of the two lowest firms will be retained until the contract is awarded. When required by the specifications herein, the awarded vendor shall furnish a performance and payment bond equal to the amount of the contract, acceptable to the City, within fourteen (14) calendar days after notification of contract award. Failure to furnish the required bond within the time specified may be cause for rejection of the bid and any bid deposit may be retained by the City as liquidated damages and not as a penalty All questions regarding the bidder's preparation of this bid, pertaining to the drawings and specifications, shall be compiled in writing and e-mailed to Anne Wilkerson, (anne.wilkerson@rockfordil.gov) City of Rockford, Finance Department, at least 72 hours prior to bid time. Questions received less than 72 hours before the designated bid time cannot be answered by addendum .
GC Bidding
$1,500,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Multiple Locations, Rockford, IL
Related To This Project
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Rockford, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
