BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2026 at 8:00 PM

Updated July 9, 2026

Site work for a library in Dublin, New Hampshire. Completed plans call for site work for a library.

The Dublin Public Library is seeking proposals from qualified contractors to excavate and resolve a sink hole on the property at 114 Main Street, Dublin, NH. Sealed proposals for the Sinkhole Resolution RFP should be submitted in accordance with the provided specifications, terms, and conditions. Proposals must be submitted by the specified deadline. The Library reserves the right to reject any or all proposals and to accept any proposal deemed to be in the best interest of the Library. Direct Contact for Questions Any questions or inquiries shall be directed to Lawrence Graves, Library Board at: lg@dplnh.org, or by telephone at (603) 357-5900; with copy to Carole Monroe at cdmonroe@myfairpoint.net. Project Description: Phase 1 . On the upper-level grounds of the Library there is a sinkhole. Facing the Library, it is the front on the right side, about four (4) feet from the stone wall on the Rte. 101 side. The depression is about four (4) feet in diameter. The center has been filled several times with gravel, but it continues to sink. History claims that an old well is located there or in the vicinity. The area needs to be excavated to determine the reason, correct the issue, fill with material topped with loam and reseeded after completion of Phase 2. Note: Getting to the area is problematic. There are a light pole, steps, and railing in the vicinity. The entrance to the area is narrow. Traffic diversion on Rte. 101 may be necessary while heavy equipment is unloaded, operated, and/or removed. Phase 2 . A section of masonry wall NW of the sinkhole is collapsing. It is unknown whether the cause is subsidence from the sinkhole, drainage/hydrology, or other cause. That section of wall has to be excavated, with the current stones removed and preserved . A new footing, with drainage, is to be installed, and the wall engineered to function as a retaining wall, with new material up to the lawn grade and the original stone and caps used above grade. Adjacent perennials and shrubs may need to be removed and preserved and replanted after the wall construction is complete. Safety railing to be added along the sidewalk. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

GC Bidding

$50,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
659
Active Projects
32
Bidding Soon
4,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

114 Main St, Dublin, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.