Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 8, 2026

Demolition, site work, paving and renovation of a water / sewer project in Chrisney, Indiana. Completed plans call for the renovation of a water / sewer project; for the demolition of a water / sewer project; for site work for a water / sewer project; and for paving for a water / sewer project.

The project includes, but is not limited to, installation of approximately 296 LF of 8-inch gravity sanitary sewer main, including three 48-inch diameter sanitary manholes, approximately 72 LF of new 6-inch sanitary laterals, lateral reconnections, and two sanitary lateral cleanouts; installation of approximately 131 LF of storm sewer, including 38 LF of 16-inch pipe and 93 LF of 12-inch pipe, with three new storm inlet structures; abandonment and removal of existing sanitary sewer, storm sewer, manholes, storm structures, and appurtenances; pavement, sidewalk, and driveway removal and restoration; bypass pumping; and all other work required for the completion of the project. The work includes all supervision, labor, materials, equipment, temporary erosion and sediment control, maintenance of traffic, clearing and grubbing, testing, granular backfill, final grading and seeding, and all appurtenances necessary to complete the project. All work shall be constructed in accordance with the plans and specifications and shall result in a complete and operational system ready for continuous service. Bonds: Bid Bond required (unspecified amount). Question Deadline 07/27/2026 Online - Q&A Award is subject to final approval.

Award

$254,970.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
53
Bidding Soon
1,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

October 2, 2026

Project location map

22 E. Chestnut St., Chrisney, IN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed