Published August 4, 2026 at 8:00 PM

Updated August 8, 2026

Demolition, site work and renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

Installation of 600-ton water cooled chiller plant, cooling towers, and associated chilled and condenser water pumps. Includes refrigerant monitoring system, emergency exhaust fan installation, replacement of six rooftop fans and variable frequency drives, and associated structural, electrical, and plumbing modifications. Work also includes demolition of existing mechanical equipment and provision of temporary cooling. Project Location:3071 SW 38 Avenue, Miami , FL 33146 If you have any questions, contact Franklyn E. Jarman at 786-473-4549. Est.value- $2,913,300 A. The Design includes the following notable features, but is not limited to this scope. Contractor is responsible for reviewing all contract documents and coordinating with all disciplines. Provide 600ton water cooled chiller plant, cooling towers, and associated chilled and condenser water pumps. Provide refrigerant monitoring system. Provide emergency exhaust fan serving chiller (machine) room . Replace six rooftop fans and variable frequency drives. Associated structural, electrical, and plumbing modifications. B. Demolition: Contractor shall remove existing chillers, cooling towers, pumps, piping, controls and related equipment as shown on plans. All utility isolations and lock-out/tag-out shall be coordinated with the Owner. Refrigerant shall be recovered per EPA rules and disposal manifests provided. Protect remaining equipment and finishes during work and legally dispose of removed materials. C. Temporary Cooling: Contractor shall furnish and operate temporary chillers, pumps, piping and connections as needed to maintain critical building temperatures during shutdowns. Tie-in and cutover procedures shall be coordinated with the Owner and performed within approved outage windows. D. Structural: Contractor shall furnish and install required structural supports, curbs, pads, anchorages and vibration isolation for new equipment as shown on plans. Any structural design performed by the Contractor shall be sealed by a Florida-licensed professional engineer. Coordinate roof penetrations and flashing with the roofing consultant and repair any structural or roof elements disturbed by the work. E. Plumbing: Contractor shall furnish make-up and blowdown connections for towers and replace the domestic booster pump skid and VFD as shown on plans. Pressure test, flush, treat and commission piping systems per the Contract Documents and applicable codes. F. HVAC: Contractor shall furnish , set, pipe and commission the new 600-ton water-cooled chiller, cooling towers, pumps, rooftop fans and VFDs, refrigerant monitoring, and associated accessories as shown on plans. Work includes factory start-up, refrigerant recovery/charging, system flushing, vibration isolation and hydronic balancing. Integrate equipment into the BAS and verify performance per the contract requirements. G. Electrical: Contractor shall furnish power distribution, starters/VFDs, disconnects and overcurrent protection sized for the new equipment, update coordination and short-circuit studies as required, and upgrade grounding and bonding as needed. Furnish control wiring, I/O panels and BAS interface for the new equipment as shown on plans. Perform electrical testing (megger, phase, rotation, continuity), verify power and metering during performance tests, and supply test reports. Furnish temporary construction power and protected circuits for temporary chillers. H. It is the intent of the department to obtain a complete and working installation under this Project and any items of labor, equipment or materials which may reasonably be assumed as necessary to accomplish this end shall be supplied whether or not they are specifically shown on the Plans or stated herein.

GC Bidding

$2,913,300.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
112
Bidding Soon
1,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 5, 2026

Project location map

3071 SW 38th Ave, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.