BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 6, 2026 at 8:00 PM

Updated July 7, 2026

Site work and renovation of a water / sewer project in Columbia, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work of this project is located along the length of the Columbia Canal totaling approximate 3.1 miles from the headgates structure most near 4122 River Dr, Columbia SC, and terminating at the Columbia Canal Hydropower facility most near 301 Gervais St, Columbia, SC. Canal embankment repair services. Site Visit - In Person Columbia Water Canal Plant Start from the Filter Building Conference Room 300 Laurel Street Columbia, SC 29201 Question Deadline 07/17/2026 at 12:00 PM ET Questions must be submitted online The Work includes but is not limited to the following: A. Site 2 (Spillway) a. Reinstallation of stoplogs B. Site 4 (Canal and Dike) a. Toe Repairs and Slope Repairs at selected locations between the Canal Headgates and the Canal Spillway as shown on the Project Drawings b. Clear the site of trees, brush, fences, and obstructions occupying space needed for construction. No structure partially encroaching on the Owner's property or located so as not to interfere with construction operations, shall be removed unless specifically noted on the Drawings or directed by the Owner/Engineer. C. Construction and removal of a temporary riverside protection berm , including dewatering d. Construction and removal of a temporary Columbia Canal cofferdam Removal of the emergency cofferdam in the existing canal near the Jarvis Klapman Bridge f. Removal of the existing breached canal dike generally located between Jarvis Klapman Bridge and the Hydroelectric Plant, excavation for a new embankment keyway, and constructing a new embankment in accordance with the Project Drawings g. Salvage demolition for select cultural resources as defined in Specification 02050 h. Finished grading, slope protection, new asphalt walking path, grassing, and replacement of existing lights, benches, and other appurtenances that exist on the top of the dike The Contractor shall perform all work in accordance with the Project Drawings and Project Specifications. Michael Baker International, Inc. will make the Project Drawings and Specifications available upon bidders submitting Appendix - Non-Disclosure Agreement.

GC Bidding

$1,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
24
Bidding Soon
1,242
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.