Site work and renovation of an elderly care / assisted living facility in Beech Grove, Indiana. Completed plans call for the renovation of a elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.

Asphalt shingle roof replacement. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Project description: The purpose of this project is to obtain pricing for the complete replacement of all existing shingle roofing system at Beech Grove Meadows skilled nursing building. The scope of work includes the main facility roof and the (2) adjoining porticos. Project Scope: 1. Verify field measurements and roof areas for the main facility including the (2) portico roofs prior to ordering materials and beginning work. 2. Coordinate scheduling, site access, staging areas, dumpster placement, and occupant protection so the facility remains safe and accessible during construction. 3. Provide all labor, materials, equipment, supervision , safety measures, fall protection, and temporary protection necessary to complete the roof replacement in accordance with applicable codes and manufacturer requirements. 4. Protect landscaping, sidewalks, pavement, wall surfaces, doors, windows, mechanical equipment, and adjacent building components from damage during roof removal and installation. 5. Tear off and remove the existing asphalt shingles from all designated roof areas, including all accessory roofing materials associated with the existing shingle roof system . 6. Remove and dispose of existing felt paper underlayment, ice barrier membrane, starter courses, ridge cap shingles, hip caps, and ridge vent materials. 7. Remove and dispose of existing drip edge, gutter apron , valley metal if present, step flashing, counter flashing, wall flashing, pipe boots, roof vents, curb flashings, and all other flashings associated with the roof system. 8. The existing gutters and downspouts are to remain . 9. Remove deteriorated roof decking and any associated roofing components that must be detached to complete deck repairs. 10. Inspect the entire roof deck after tear-off and refasten any loose decking to the supporting structure as required to provide a sound substrate for the new roofing system. 11. Replace damaged, delaminated, water-stained, or otherwise deteriorated roof decking with new decking of matching thickness and appropriate type for the application area, including treated OSB where required at firewall locations and standard sheathing at typical areas. 12. Install new drip edge and gutter apron metal at all roof perimeters where required to provide proper edge protection and water control. 13. Install self-adhered ice and water shield at eaves, gutters, valleys, transitions, and other vulnerable locations, extending to code-required coverage and in accordance with manufacturer instructions. 14. Install synthetic underlayment over the remaining roof deck in shingle- fashion and in strict accordance with the roofing manufacturer's published installation requirements.15. Install new valley lining or valley flashing as applicable to the roof configuration and shingle system being provided. 16. Install new flashing at all walls, parapets, firewalls, curbs, roof-to-wall transitions, and similar conditions, including step flashing, counter flashing, apron flashing, and termination details as required for a complete watertight assembly. 17. Install new coping-related flashing details at firewall conditions where existing wall caps or coping interfaces require roofing tie-in for proper weatherproofing. 18. Install new pipe boots or flashing collars at every pipe penetration and provide new flashing and sealant at all roof penetrations, projections, and equipment curbs. 19. Install new roof vents and ventilation components at existing vent locations, including ridge vent materials where present, to maintain or improve the performance of the existing roof ventilation system . 20. Install starter shingles at all eaves and rake edges in accordance with manufacturer requirements for wind resistance and system warranty compliance. 21. Install new architectural asphalt shingles across all field areas in accordance with manufacturer specifications, including required fastening pattern , exposure, alignment, and weather-lapping procedures. 22. Install matching hip and ridge cap shingles at all hips and ridges, including shingle-over ridge vent assemblies where applicable. 23. Seal all exposed fasteners, terminations, laps, and transition points with manufacturer-approved sealant where required to complete the roofing system . 24. Perform daily and final cleanup of all roofing debris, fasteners, packaging, and related construction waste from roof surfaces, grounds, planting beds, sidewalks, drive lanes, and all other affected areas of the property. 25. Include dumpsters, hauling, lawful disposal of removed materials, and all associated transportation and tipping costs in the base bid. 26. Include an allowance for replacement of up to 20 sheets of roof decking in the base bid. Any decking replacement exceeding this allowance shall be identified and priced on a per-sheet basis as a unit cost. 27. Provide product data and submittals for the proposed shingles, underlayment, ice barrier, flashing components, ventilation products, and accessory materials prior to installation. 28. Provide manufacturer warranty information for roofing materials and a separate workmanship warranty covering labor and installation. 29. Obtain and pay for all permits, inspections, municipal fees, and regulatory requirements necessary to complete the work, if required by the local authority having jurisdiction. 30. At project completion, conduct a final walkthrough, confirm all roof areas are fully complete and watertight, and submit warranty documentation , closeout information, and any final unit pricing for additional decking replacement if applicable.

Sub-Bidding

$1,500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
15
Bidding Soon
1,144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

2002 Albany St, Beech Grove, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.