Demolition, site work, paving, new construction and renovation of a road / highway in Visalia, California. Completed plans call for the demolition of a road / highway; for the renovation of a road / highway; for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.

This project has an estimated project cost of approximately $3,523,000. The work to be done will be in three locations, Mineral King Road mile post (MP) 4.5, Mineral King Road MP 5.3 and Wishon Drive. The work consists of replacing the temporary repairs with permanent repairs on Mineral King Road and Wishon Drive (M208) for the damage and failure of the roadway/shoulder, slope embankments due to catastrophic storms in March of 2023. The temporary repairs consist of installation of cold mix asphalt and asphalt concrete dike/berm along damaged roadway/shoulder areas, timber bridges and gabion (rock) baskets spanning and/or reinforcing the slope failures. The proposed permanent repairs at Mineral King Road will consist of constructing gabion retaining walls with lightweight cellular concrete backfill & driven soil nails, installation of corrugated metal pipe culverts and concrete headwalls, and placing HMA. At Wishon Drive, the work consists of constructing gabion retaining walls with lightweight cellular concrete backfill and placing HMA removing the temporary timber bridge structures and constructing retaining structures and filling in the failed slope with resistant material . Permanent repairs will also include the placement of hot mix asphalt concrete, asphalt concrete dike, slope protection measures, and restoring minor voids with import borrow material. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. Bidders may visit the project site. Permanent roadway restoration replacing temporary repairs, including construction of gabion retaining walls with lightweight cellular concrete backfill and driven soil nails, installation of corrugated metal pipe culverts and concrete headwalls, placement of hot mix asphalt concrete, asphalt concrete dike, slope protection, and restoration of slope failures. Bonds: 10% Bid Bond, Certified Check required, Performance Bond required (unspecified amount), Payment Bond required (unspecified amount). Questions must be received by 5:00 pm on Wednesday, July 29, 2026

GC Bidding

$3,523,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
9
Bidding Soon
834
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.