BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 8, 2026 at 8:00 PM

Updated July 9, 2026

Site work and new construction of a municipal facility in Cordova, Alaska. Completed plans call for site work for a municipal facility; and for the construction of a municipal facility.

Engineering services for the design of a 2,600 linear foot electrified chain link bear fence with vehicle gates and a solar/battery power system for the 17 Mile Landfill. The City of Cordova is requesting written proposals from qualified engineering firms (The Firm) interested in providing engineering services for the design of the 17 Mile Landfill Electrified Bear Fence. The fence should consist of approximately 2,600 linear feet of chain link fencing with two (2) vehicle entrance gates. The fence must be able to withstand and repel attempts to access the Municipal Solid Waste Cell by mature and juvenile brown bears . The City's initial thoughts is that such a fence should be at least 8 feet tall and have a minimum of 3 feet of chain link buried in the ground to prevent bears from digging under the fence. City will work with The Firm to determine final design based on engineers expertise with similar projects and appropriate design based on locations physical and geological conditions . The fence must also be electrified. There is no city supplied power at the landfill so electricity must be supplied by a solar/battery system or other systems that may be proposed If desired a site visit can be arranged. Questions regarding this proposal and site visits can be coordinated with Aaron Muma refuse@cityofcordova.net 907-424-5600, or Kevin Johnson at pubworks@cityofcordova.net. 907-424-6220. The Firm will provide the necessary design (details, plans, material specifications, etc) to accomplish the construction of a bear resistant fence that will enclose the existing Municipal Solid Waste Cell (see attached conceptual fence layout). Access to the cell must be accomplished in a way that allows for staff to safely open and close the gate(s) for standard size garbage trucks (minimum width of 20') to enter the cell without bears following in behind. Design should be done in such a way that allows for expansion of the fenced area as needed for future cells to be included within the fenced area.

GC Bidding

$800,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
5
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Cordova, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.