BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2026 at 8:00 PM

Updated July 29, 2026

Site work for a water / sewer project in Renton, Washington. Completed plans call for site work for a water / sewer project.

Modify and replace six dissolved air flotation thickener (DAFT) mechanisms, piping and appurtenances, their related cover systems and access hatches, and associated electrical equipment. This project also includes the modification of the existing concrete tank walls for four DAFTs. James W. Fowler Co. is requesting Quotes for the following Categories: Concrete Supply Rebar Cast-In-Place Concrete Grouting Concrete Cutting & Boring Saw Cutting Metal Fabrication Metal Doors & Frames Coating/Painting Signage HVAC Electrical Cathodic Protection Geotechnical Instrumentation & Monitoring Erosion Control Instrumentation & Controls Mechanical (Process Integration) The work to be performed under this Contract consists of furnishing all tools, equipment, materials, supplies, and manufactured articles; furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and performing all work or other operations required for the fulfillment of the Contract, in strict accordance with the Contract Documents . Provide complete work. Provide all work, materials, and services not expressly indicated in the Contract Documents that may be necessary for the complete and proper construction of the work and administration of the contract. The project work is located at the South Treatment Plant, 1200 Monster Road SW, Renton, Washington 98057. The purpose of this project is to modify and replace six dissolved air flotation thickener (DAFT) mechanisms, piping and appurtenances, their related cover systems and access hatches, and associated electrical equipment. This project also includes the modification of the existing concrete tank walls for four DAFTs. A. Achieve Substantial Completion within 1342 days of the effective date of Notice to Proceed (NTP). B. Achieve Final Acceptance within 90 days of Substantial Completion Engineer's Estimate: $29,958,000.00 Minority Business Enterprise (MBE): 10% of the Contract Price Women Business Enterprise (WBE): 6% of the Contract Price. Bid Guaranty: Not less than five percent (5%) of the Total Bid Price. Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Contract Specialist: Lea McCormick, Imccormick@kingcounty.gov, 206-263-9396 Alternate Contract Specialist: Jillian Decoteau, jdecoteau@kingcounty.gov, 206-477-6181 Question Deadline 07/23/2026 No oral clarification or interpretations will be made to any Bidder as to the meaning of the Contract Documents. Requests for clarification shall be made in writing via email to the Contract Specialist and cc the Alternate Contract Specialist at least @seven (7) days prior to the bid opening date. The County may not respond to requests for clarification that are received outside of this timeframe, Contract Specialist: Lea McCormick, Imccormick@kingcounty.gov, 206-263-9396

GC Bidding

$29,958,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
79
Bidding Soon
2,094
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.