BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2026 at 8:00 PM

Updated July 9, 2026

Site work and new construction of a bridge / tunnel in Clarksdale, Mississippi. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Project Description: Provide materials, labor, and equipment to construct two concrete bridge abutments for an approximately 80 foot-long, 6-foot wide pedestrian bridge for the Sunflower River Walk Construction Contract: Bids will be received for the following Work: 1. General Construction (all trades). Submit written questions to be addressed at Prebid meeting minimum of two (2) business days prior to meeting. Bonds: 100% Performance Bond, 100% Payment Bond, Bid Bond required (unspecified amount).

GC Bidding

$3,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
8
Bidding Soon
367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

121 Sunflower Ave, Clarksdale, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.