BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 14, 2026

Site work and paving for a civil project in Cedar Bluff, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Resurfacing and drainage improvements along Sewell Ferry Road and Hidden Cove Circle including (Bid Schedule ''A'') 5,000' of ditch excavation, 1,340 CY of borrow excavation, 175 tons crushed aggregate base course, 370 tons crushed aggregate, 100 tons coarse aggregate, 104' of 18'' RCP, 80'' of 24'' RCP, 420' of 15'' CHDPE, mobilization and traffic control, 6 EA roadway pipe end treatments, 200 CY topsoil, 2 AC hydroseeding, erosion control items, 50 tons riprap, Class 1 and related items and (Bid Schedule ''B'') 543 tons superpave wearing surface, 115 tons superpave binder, 100 tons super pave patching, 329 tons super pave leveling, 295 tons aggregate surfacing, 2 MI solid yellow, Class 2, Type A traffic stripe, 58 SF traffic control marking, 73 pavement markers, mobilization and traffic control and related items. Unsuccessful bidders will be refunded 100% of the plan deposit for one set returned to the Engineer, in reusable condition, within 10 days after the bid opening. Additional sets obtained shall be refunded 50% of the plan deposit. All non-bidders, subcontractors, vendors or dealers shall be refunded 50% of the plan deposit for each set returned to the Engineer, in reusable condition, within 10 days after the bid opening. The plan deposit amount as indicated above is in accordance with Alabama Act No. 97-225 relating to the competitive bid laws for public works.

Post-Bid

$450,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
145
Bidding Soon
1,811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 12, 2026

Project location map

Multiple Locations, Cedar Bluff, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.