Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 9, 2026 at 8:00 PM
Updated July 13, 2026
Site work and paving for a mixed-use development in San Joaquin, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The selected consulting firm (CONSULTANT) will perform professional and technical engineering services for the Washing Area Complete Streets Project (PROJECT). .State : CA CONSULTANT will design and engineer the Washington area neighborhood roadway into a "complete streets" corridor, The PROJECT will include the construction of new sidewalks and buffered bike lanes, as well as enhanced intersections throughout the project area. Improvements will be constructed along Washington Street, Del Mar Avenue, Horner Avenue, and Walker Lane. Washington Street Improvements (Anteros Avenue to Walker Lane) o New curb, gutter and sidewalk on the north and south sides of the street. o Reconfigured striping to add buffered bike lanes and parking lanes in each direction. o Add ladder-style pedestrian crosswalk markings at Hinkley Ave, Olive Ave, Adelbert Ave, Gertrude Ave, Sinclair Ave, Coolidge Ave, Carroll Ave, Dawes Ave, Wagner Ave, Del Mar Ave, Anthony Ave, and Thelma Ave intersections. o Add pedestrian crosswalk striping at the Anteros Ave, Oro Ave, Adrienne Ave, Walker Ave, May Ave, and Walker Ave intersections. o Add ADA curb ramps at all intersection corners. o Add corner curb extensions (bulb-outs) with ADA curb ramps at each corner of the Oro Ave, Gertrude Ave, Wagner Ave, Adrienne Ave, and Walker Ave intersections. o Add a traffic circle at the Carroll Ave intersection. o Storm drain pipe and inlet installation, as necessary to complete the storm drainage network Del Mar Avenue Improvements (Horner Avenue to Washington Street) o New curb, gutter, and sidewalk along the east and west sides of the street. o Add ADA-compliant curb ramps at intersections, as necessary. o Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Horner Avenue Improvements (Del Mar Avenue to Walker Lane) o New curb, gutter, and sidewalk along the north side of the street. o Add ADA-compliant curb ramps at intersections, as necessary. o Walker Lane Improvements (Horner Avenue to Washington Street) o New curb, gutter, and sidewalk along the east and west sides of the street. o ADA-compliant curb ramps at intersections, as necessary. o Add pedestrian crosswalk striping at the Marsh St and Hobart Ave intersections. Engineering services estimated duration: Twelve (12) months. The method of Contractor Selection has not been Determined at this time. Requests for proposals for design services is underway.
Conceptual
$500,000.00
Public - County
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Multiple Locations, San Joaquin, CA
Related To This Project
San Joaquin, CA
--
San Joaquin, CA
Bid Date: Apr 14 2026
San Joaquin, CA
Bid Date: Jan 07 2026
San Joaquin, CA
Bid Date: Oct 23 2025
San Joaquin, CA
--
San Joaquin, CA
Bid Date: Jun 11 2025
San Joaquin, CA
Bid Date: May 29 2025
San Joaquin, CA
--
San Joaquin, CA
Bid Date: Apr 17 2025
San Joaquin, CA
Bid Date: Apr 17 2025
San Joaquin, CA
Bid Date: Apr 17 2025
San Joaquin, CA
Bid Date: Mar 19 2025
San Joaquin, CA
Bid Date: Feb 20 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
