BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 1, 2026

Demolition, site work and renovation of a power facility in Monterey Park, California. Completed plans call for the renovation of a power facility; for the demolition of a power facility; and for site work for a power facility.

Q&A Deadline 07/24/2026 10:00 AM (PDT) Project 1 - Central Plant Improvement CUP Upgrade: The Central Utility Plant (CUP) Upgrade includes increasing cooling capacity. The current CUP utilizes a 1000-ton centrifugal chiller as well as a chilled water thermal energy storage tank to serve the campus cooling loads. The solar thermal storage tanks and ice storage system will be demolished. The current solar thermal system will be drained and decommissioned. The chilled water pumps will be replaced to supply the added capacity. The condenser pumps and portions of the condenser piping will be replaced to maximize the capacity of the existing cooling towers. Finally, this project will include upgrades to the CUP to meet current codes and standards, including life safety systems, improved acoustical performance of the CUP office, and building structural upgrades. Project 2- Hydronic Line Replacement Hydronic Line Replacement: The goal of the Hydronics Infrastructure Upgrade project is to replace the entirety of the chilled water and hot water distribution piping. A phased approach will be utilized including the use of temporary heating and cooling equipment to minimize building shutdowns and system outages during construction. The existing distribution system is located primarily within an underground tunnel system with some portions of direct buried piping. During the design of the PPC, a segment of the chilled water piping failed multiple times. As a result, this segment will be replaced under a separate scope of work. The DBE shall coordinate with the latest plans or scope of work for 40J-829.02 Infrastructure - Hydronic Line Replacement. In addition to replacing piping, minor tunnel repairs will be completed, and tunnel lighting will be upgraded to LED fixtures. Areas of direct-buried disturbed by piping replacement will be landscaped to match the existing condition. Central Plant Improvement: Estimated Cost of Construction: 4,800,000.00 Hydronic Line Replacement: Estimated Cost of Construction: 31,000,000.00

Sub-Bidding

$20,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
646
Active Projects
190
Bidding Soon
3,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2026

April 12, 2027

Project location map

2350 Corporate Pl, Monterey Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.