Published July 8, 2026 at 8:00 PM
Updated July 10, 2026
Demolition, site work and renovation of a power facility in Monterey Park, California. Completed plans call for the renovation of a power facility.
Project 1 – Central Plant Improvement CUP Upgrade: The Central Utility Plant (CUP) Upgrade includes increasing cooling capacity. The current CUP utilizes a 1000-ton centrifugal chiller as well as a chilled water thermal energy storage tank to serve the campus cooling loads. The solar thermal storage tanks and ice storage system will be demolished. The current solar thermal system will be drained and decommissioned. The chilled water pumps will be replaced to supply the added capacity. The condenser pumps and portions of the condenser piping will be replaced to maximize the capacity of the existing cooling towers. Finally, this project will include upgrades to the CUP to meet current codes and standards, including life safety systems, improved acoustical performance of the CUP office, and building structural upgrades. Project 2 – Hydronic Line Replacement Hydronic Line Replacement: The goal of the Hydronics Infrastructure Upgrade project is to replace the entirety of the chilled water and hot water distribution piping. A phased approach will be utilized including the use of temporary heating and cooling equipment to minimize building shutdowns and system outages during construction. The existing distribution system is located primarily within an underground tunnel system with some portions of direct buried piping. During the design of the PPC, a segment of the chilled water piping failed multiple times. As a result, this segment will be replaced under a separate scope of work. The DBE shall coordinate with the latest plans or scope of work for 40J-829.02 Infrastructure – Hydronic Line Replacement. In addition to replacing piping, minor tunnel repairs will be completed, and tunnel lighting will be upgraded to LED fixtures. Areas of direct-buried disturbed by piping replacement will be landscaped to match the existing condition.
GC Bidding
$20,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
1055 Corporate Center Drive, 5th Floor, Monterey Park, CA
Related To This Project
Monterey Park, CA
--
Monterey Park, CA
--
Monterey Park, CA
Bid Date: Jul 16 2026
Monterey Park, CA
Bid Date: Jun 11 2026
Monterey Park, CA
Bid Date: May 27 2026
Monterey Park, CA
--
Monterey Park, CA
Bid Date: May 20 2026
Monterey Park, CA
Bid Date: Apr 16 2026
Monterey Park, CA
Bid Date: Apr 30 2026
Monterey Park, CA
Bid Date: May 08 2026
Monterey Park, CA
Bid Date: Mar 20 2026
Monterey Park, CA
Bid Date: Mar 20 2026
Monterey Park, CA
Bid Date: Jan 28 2026
Monterey Park, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.