BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 13, 2026 at 8:00 PM

Updated July 16, 2026

Site work and outdoor lighting for a sidewalk / parking lot in New Bedford, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

The Work of the Contract consists of, but is not limited to 1. The Contractor shall furnish/ install all labor, materials and equipment necessary for the upgrades to the Dusk to Dawn Lighting at the Shawmut Village Family Development. All work affecting residents shall be coordinated with the Tenant Coordinator(s) in accordance with Section 01 16 16, Tenant Coordinator. The Contractor shall maintain accurate as-built records throughout construction reflecting any deviations from the Contract Documents, and shall submit a complete closeout submittal package to the Owner upon completion of the Work, including as-built drawings, operation and maintenance manuals, and warranties, prior to release of final payment. 2. Upgrade of Exterior Dusk to Dawn Lighting at Shawmut Village. The Work includes upgrades of existing front and rear porch lights throughout the development. Install one photocell per building to control all porch lights. The work also includes addition of new exterior lighting wall pacs, and visitor parking lot lighting to improve exterior illumination and enhance resident safety. 3. Locations are designated in the attachments. These locations are estimated and are not to scale. 4. The Units shall be mounted on or within ceilings as well as on or within walls Goals for minority participation 18% Goals for female participation 6.9% The project consists of but not limited to: Upgrades of existing front and rear porch lights throughout the development. Install one photocell per building to control all porch lights. The work also includes addition of new exterior lighting wall pacs, and visitor parking lot lighting to improve exterior illumination and enhance resident safety. General bidders must be certified by the Division of Capital Asset Management and Maintenance (DCAMM) in the following category of work, Electrical, and must submit a current DCAMM Certificate of Eligibility and signed DCAMM Prime/General Contractor Update Statement. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. General bids and sub-bids shall be accompanied by a bid deposit that is not less than five (5%) of the greatest possible bid amount

Sub-Bidding

$275,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
608
Active Projects
19
Bidding Soon
3,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.