Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2026 at 8:00 PM

Updated September 3, 2026

Site work and paving for a sidewalk / parking lot in Alton, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed project consists of the removal and replacement of concrete sidewalks, concrete driveways, concrete curbs, combination concrete curb and gutters and miscellaneous other work at various locations throughout the City of Alton, Illinois. The locations of the proposed work are shown on the location maps contained in the plans, and the work to be performed at each location is identified on the summary of quantities in the plans. Removal and replacement of concrete sidewalks, driveways, and curbs at various locations throughout the City of Alton.

Award

$115,050.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
100
Bidding Soon
1,684
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2026

October 5, 2026

Project location map

Multiple Locations, Alton, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed