Updated August 18, 2026
Demolition, site work and new construction of a fire / police facility in Alton, Illinois. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.
Pursuant to 70 ILCS 705/11k, The Fosterburg Fire Protection District is soliciting sealed competitive bids for construction of new entry stairs and ADA compliant ramp at Fosterburg Fire Protection District Station #2. GENERAL PROJECT DESCRIPTON : Location of the property: 4604 Seminary Road, Alton Illinois, 62002. The project consists of removing and disposing of the existing wooden stairs and ramp structure. Constructing a new porch, ramp, stairs, and landing pads at the Northeast building entrance. The ramp and stairs shall be constructed with pressure-treated wood for structure and railing. Slip resistant composite material shall be used for all decking. Landing pads should be concrete. The new porch will be installed to match the existing entry door height and have a minimum dimension of 60 inches by 60 inches. The porch shall be large enough to accommodate both stairs and ADA compliant ramp. The porch shall have a handrail on three sides. The top of handrail gripping surface shall be between 34 and 38 inches above the porch surface. The ends of the handrails shall be either rounded or returned smoothly to floor, wall, or post. The ramp shall be installed to match the new porch height with a maximum slope of 1:12 and a minimum clear width of 36 inches. The ramp shall be constructed to proceed East from the porch and include the appropriate number of switchbacks so that it ends within 35 feet of the entry door. Landings between switchbacks shall be at least 60 inches by 60 inches. Ramp sections shall run parallel to the existing parking area. The ramp shall have a handrail on both sides. The top of handrail gripping surface shall be between 34 and 38 inches above the ramp surface and be continuous. The ends of the handrails shall be either rounded or returned smoothly to floor, wall , or post. The ramp landing pad shall be at least 60 inches by 60 inches with a maximum slope of 1:48 and a slip-resistant broom finish. ADA access beyond the ramp and porch is not included as part of this project. The new stairs should be installed to match the new porch height and have a minimum clear width of 36 inches. The stairs shall be constructed on the North side of the porch and run parallel with the building. The stairs shall have a handrail on both sides. The top of handrail gripping surface shall be between 34 and 38 inches above the stair surface. The stair landing pad shall be at least 60 inches by 60 inches with a maximum slope of 1:48 and a slip-resistant broom finish . All wood materials shall be critical load rated pressure-treated lumber. Structural framing shall include a minimum of 2X6 joists and 2X8 rim joists.All composite materials shall be slip resistant.
Sub-Bidding
$500,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 18, 2026
October 19, 2026
4604 Seminary Rd, Alton, IL
Related To This Project
Alton, IL
Bid Date: Aug 19 2026
Alton, IL
Bid Date: Aug 05 2026
Alton, IL
Bid Date: Jul 22 2026
Alton, IL
--
Alton, IL
Bid Date: Jun 16 2026
Alton, IL
Bid Date: Jun 02 2026
Alton, IL
Bid Date: Jun 04 2026
Alton, IL
Bid Date: Jun 04 2026
Alton, IL
Bid Date: Apr 20 2026
Alton, IL
Bid Date: Jun 16 2026
Alton, IL
Bid Date: May 06 2026
Alton, IL
Bid Date: May 06 2026
Alton, IL
Bid Date: Apr 24 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.