Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 10, 2026

Site work, new construction and renovation of a multi-residential development in Orleans, Massachusetts. Completed plans call for the construction of a multi-residential development; for the renovation of a multi-residential development; and for site work for a multi-residential development.

Furnishing and installing the sewer line to the Main Street sewer stub, replumbing the sewer within the basement and abandoning the existing septic system. Bonds: 5% Bid Bond. The Work under the Contract consists of: 1. All Work is either shown on the Drawings or included in the Specifications unless specifically indicated as not to be done. 2. The Project shall consist of, but not limited to: Furnishing and installing the sewer line to the Main Street sewer stub, replumbing the sewer within the basement and abandoning the existing septic system. B. In addition, the Work under the Contract includes: 1. Work outside the Project Site as called for in the Contract Documents and as required for the performance of the Work. 2. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 3. Providing and restoring, where appropriate, all temporary facilities. Question Deadline 07/30/2026 at 12:00 PM ET All bidding Requests for Information (RFIs) shall be submitted online

Award

$54,200.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
265
Bidding Soon
3,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

September 7, 2026

Project location map

181 Main St, Orleans, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed