Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2026 at 8:00 PM

Updated September 23, 2026

Site work, renovation and addition to a mixed-use development in Fossil, Oregon. Working plans call for the renovation of a educational facility; and for the addition of a educational facility.

*The owner has selected an architect, and the contract design documents are expected in Q1 2027. Architectural, engineering, and consulting services for the planning, design, and construction of a locker room remodel and library addition. The scope of work involves the new Library building, envisioned as building up to 2,000 SF, with two offices and a restroom. This new building needs to also tie into all existing campus communication systems but will likely have an independent power and mechanical service. Remodel of grade school locker rooms, high school locker rooms and grade school bathrooms. Preliminary conceptual designs are shown in Exhibit B. Design is anticipated to occur over an approximately (6 - 8) month period, with the majority of construction occurring over the summer and all construction estimated to be completed by December 2027. The total approximate budget for these projects is $4,000,000. Deadline for Questions and Requests for Clarifications (please submit written questions via email) July 15, 2026 2:00 PM Any questions regarding this Proposal are to be directed in writing to Corrina Jaeger via email. Corrina Jaeger Fossil School District 21J PO Box 206 Fossil, Oregon 97830 E-mail : cjaeger@fossil.k12.or.us

Pre-Construction/Negotiated

$4,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

March 17, 2027

Project location map

PO Box 206, Fossil, OR

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed