BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated August 3, 2026

Site work and paving for a civil project in Bayfield, Wisconsin. Completed plans call civil work for a road / highway and water / sewer project.

The Red Cliff Band of Lake Superior Chippewa Indians is soliciting sealed proposals from qualified contractors for the construction of approximately 600 linear feet of roadway. The work includes installation of water main, sanitary sewer, stormwater containment, and modification of the existing roadway entrance at 88705 State Highway 13. The selected contractor shall furnish all labor, materials, equipment, and incidentals necessary to complete the project as shown in the engineered plans. Major components include: Roadway construction Water main installation Sanitary sewer installation Stormwater containment system Modification of the State Hwy 13 entrance, permit will be needed. Testing, restoration, and compliance activities

Post-Bid

$1,500,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
14
Bidding Soon
315
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2026

August 10, 2026

Project location map

88705 WI-13, Bayfield, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.