Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 16, 2026 at 8:00 PM
Updated October 22, 2026
Site work, renovation and addition to a water / sewer project in Trinidad, Texas. Completed plans call for the addition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Construction of electrical building additions and installation of medium-voltage (MV) electrical equipment at Richland Chambers Lake Pump Station (RC1) and Cedar Creek Lake Pump Station (CC1). Questions are to be submitted using the Question-and-Answer process on the Procurement Website. The primary purpose of this project is to improve the safety and reliability of the existing pump stations, Richland Chambers Lake Pump Station (RC1) and Cedar Creek Lake Pump Station (CC1), by replacing the medium -voltage (MV) electrical equipment in the new electrical buildings. RC1 has six pumps driven by 5,500-horsepower (hp), 4,000-volt (V) induction motors. The Brazos Electric Power Cooperative-owned substation has two dedicated transformers that provide power to the existing 4,160 V main-tie-main ( MTM ) switchgear in the pump room . The switchgear powers MV soft starters that operate the pump motors. Following are the specific improvements at RC1: Add new environmentally controlled Electrical Building; Replace the existing MV equipment and 480 V motor control center (MCC); Add new MV variable frequency drives (VFDs) for the pumps; Remove existing MV switchgear, soft starters, capacitors, and harmonic filters; Add anew low-voltage diesel generator for controls and security system power; Add new air handling units (AHUS) and chillers; Replace existing Modicon Quantum Programmable Logic Controller ( PLC) and Remote I/O (RIO) units with new Modicon M580 PLC and X80 units; Modify existing Alerton heating, ventilation, and air conditioning (HVAC) controls and integrate them into the station control system; Add limit switches to pump isolation butterfly valves; Site grading, paving and drainage improvements; Reroute and replace existing fiber optic cable; Run new Fiber optic cable to the new electrical building; and Reroute the power feeder to the existing microwave building. CC1 has six pumps driven by 3,000 hp, 4,000 V induction motors. The Tarrant Regional Water District (TRWD)-owned substation with two transformers provides power to the existing 4,160 V MTM switchgear in the pump room. The switchgear powers MV soft starters that operate the pump motors. Specific improvements at CC1 include: Add new environmentally controlled Electrical Building; Replace the existing MV equipment and 480 V MCC; Add new MV VFDs for the pumps; Remove existing MV switchgear, soft starters, capacitors, and harmonic filters; Replace the substation transformers and secondary termination structure with larger units to accommodate future upsizing of the pumps (existing six 3,000 hp pumps will be replaced with six 5,500 hp pumps) ; Replace the substation control house and replace existing 138-kilovolt (kV) substation relays with new protective relays; Add low-voltage diesel generator for controls and security system power; Add new AHUS and chillers; Replace existing Modicon Quantum PLC and RIO units with new Modicon M580 PLC and X80 units; Modify existing Alerton HVAC controls and integrate them into the station control system; Replace the existing pump control valve actuators; Add limit switches to pump isolation butterfly valves; Site grading, paving, and drainage improvements; Reroute and replace the existing fiber optic cable; and Run new fiber optic cable to the new electrical buildings. Question Deadline 09/23/2026 at 12:00 PM CT
Bid Results
$141,626,110.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2026
December 14, 2026
Multiple Locations, Trinidad, TX
Related To This Project
Trinidad, TX
Bid Date: Sep 25 2026
Trinidad, TX
Bid Date: Sep 30 2026
Trinidad, TX
Bid Date: May 21 2026
Trinidad, TX
Bid Date: Feb 27 2026
Trinidad, TX
Bid Date: Aug 20 2025
Trinidad, TX
Bid Date: Jul 03 2025
Trinidad, TX
Bid Date: Feb 24 2025
Trinidad, TX
Bid Date: Oct 29 2024
Trinidad, TX
Bid Date: Jun 21 2022
Trinidad, TX
Bid Date: Mar 10 2022
Trinidad, TX
Bid Date: Sep 28 2023
Trinidad, TX
Bid Date: Feb 09 2023
Trinidad, TX
Bid Date: Aug 30 2022
Trinidad, TX
Bid Date: Jun 14 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed