BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2026 at 8:00 PM

Updated July 26, 2026

Demolition and site work for a development in Saratoga, Wyoming. Completed plans call for the demolition of a development; and for site work for a development.

Removal of 5.64 miles of elk fence and 4.7 miles of stock fence; reconstruction of 10.34 miles of fence using No-Clipz system including steel posts, stays, and wire installation. Bonds: 10% Bid Bond, Certified Check required. Question Deadline 07/31/2026 at 1:00 PM MT Written questions about the procurement process should be submitted through thePublic Purchase online bidding system This project will consist of removing 5.64 miles of 8' elk fence and removing 4.7 miles of stock fence. All materials must be removed and disposed of at the Saratoga Landfill. The Saratoga Landfill is open Monday- Saturday 8am - 5pm. Located at 41.45376, -106.7601. Metal products may be removed by contractor for scrap if desired or deposited at designated metal piles at the Saratoga Landfill . The contractor shall rebuild 10.34 miles of fence with No - Clipz fence system. Braces to be built every quarter mile or where needed due to topographical needs. Corners and gate locations will require double braces. Steel posts will be placed every 36' and placed 2' into the ground, stays will be placed every 12', alternating between black and white. Wire spacing specifications from the ground up are ( 18", 26", 38") smooth, barbed, barbed. The work window is June 1 - November 14 for the duration of contract. All materials are in hand and supplied by WGFD. If livestock is present outside the fence, it must be put back up the same day as removal.

Sub-Bidding

$2,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
11
Bidding Soon
310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

October 26, 2026

Project location map

Pennock Ct, Saratoga, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.