BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work for a municipal facility in Saratoga, Wyoming. Completed plans call for site work for a municipal facility.

This project consists of re-roofing the Brush Creek/Hayden Office located at the Saratoga District Office Administrative Site on the Brush Creek/Hayden Ranger District in Saratoga, WY. The work includes complete demolition of existing roof coverings, gutters, downspouts, and underlayment, followed by full replacement with new underlayment, a new 24-gauge (minimum) Structural Standing Seam Roof System (SSSRS), gutters, and downspouts for the entire roof, and a snow guard system to protect HVAC units on the northeast end of the building. All exposed cut metal shall be finished to match the integrity and aesthetic of the panel finish. Removed gutters and downspouts must be kept in working order and returned to the Brush Creek/Hayden Ranger District. The roof area to be replaced is estimated at 9,600 SF and consists of cedar wood shake shingles and underlayment, which shall be removed down to the existing sheathing before installing new metal roof panels. Panel color must be approved by Forest Service leadership, and color swatches from the manufacturer shall be delivered to the Brush Creek/Hayden Ranger District Office by the contractor. The contractor is responsible for removing and disposing of all waste materials associated with the work and for daily site cleanup. The building must remain safe and accessible to employees and the public throughout the contract. Any damage to the building or site resulting from the work shall be the contractor's responsibility. All work must comply with industry standards, local building codes, and manufacturer installation recommendations. Specifications and requirements are summarized in the Statement of Work, with a more comprehensive list in Appendix V. Conflicting information will be resolved by the Contracting Officer. **Location:** Brush Creek/Hayden Ranger District Office, 2171 Highway 130, Saratoga, WY 82331 DISCLOSURE OF MAGNITUDE: $100,000 - $250,000 Questions are due by August 18, 2025, by 11:00 a.m. Central Time. Period of Performance: 10/01/2025 to 09/30/2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. QA date - 18 August 2025 10:00 AM Questions and Proposals shall be submitted by the due date and time via email to: POCs: JANICE KING, CONTRACT SPECIALIST, janice.king@usda.gov and LUCAS DAHLMAN, CONTRACTING OFFICER, lucas.dahlman@usda.gov.

Post-Bid

Municipal

$250,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

30

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
17
Bidding Soon
239
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2025

October 1, 2025

Project location map

2171 WY-130, Saratoga, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.