Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 14, 2020 at 8:00 PM

Updated November 9, 2024

Site work for a water / sewer project in Saratoga, Wyoming. Completed plans call for site work for a water / sewer project.

Extending the Town of Saratoga's water main to the proposed site of the North Platte Valley Medical Center, near W. Bridge Ave. and 13th Street. This includes adding 885 LF of 8" water main, 420 LF of 6" water main, remove and replace two fire hydrants, installing 2 new fire hydrants, and all associated appurtenances. Surfacing restoration and a 1.5-inch overlay.

Award

Water / Sewer

$218,376.00

Public - County

Site Work

10

1

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
11
Bidding Soon
322
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2020

October 14, 2020

Project location map

S 13th St & W Bridge Ave, Saratoga, WY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed