Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 17, 2026 at 8:00 PM

Updated August 23, 2026

Site work, paving and renovation of a sidewalk / parking lot in Biggs, California. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the renovation of a sidewalk / parking lot.

Construction of ADA-compliant Portland cement concrete sidewalk, driveway approach reconstruction, two Caltrans Case CH curb ramps with detectable warning surfaces, removal and replacement of concrete valley gutter, and adjustment of water meter boxes to grade. Bonds: 10% Bid Bond, Certified Check required, 100% Payment Bond, 100% Performance Bond, 10% Maintenance Bond. Question Deadline: 07/20/2026 at 5:00 PM PT

Final Planning

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
98
Bidding Soon
1,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2026

September 29, 2026

Project location map

Multiple Locations, Biggs, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed