Published September 9, 2026 at 8:00 PM
Updated September 10, 2026
Site work and new construction of a municipal facility in Tampa, Florida. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
Construction of the East Mainline Toll Gantry and associated civil site work along the Eastbound Selmon Expressway, including permits, labor, equipment, materials, tools, transportation, mobilization, demobilization, and maintenance of traffic. Question Deadline 08/07/2026 at 9:00 AM ET Questions about this ITB for interpretation, clarification or about the project must be in writing addressed to THEA Procurement Department at Procurement@tampa-xway.com. The general Scope of Work consists of but is not limited to : Providing all the permits, labor, equipment, materials, tools, transportation, supplies, insurance, incidentals, mobilization, demobilization and maintenance of traffic necessary to construct the new East Mainline Toll Gantry and Civil Site Project. Furnish & install all required gantry structures and toll equipment including conduit (open trench, directional bore and bridge mounted), fiber optic cable, communication cable, pull & splice boxes and junction boxes. Furnish & install electrical wire and power service for all installed equipment. Furnish & install wire and connections to the existing generator systems. Furnish & install the required toll building and architectural components. Widen and reconstruct the eastbound and westbound roadways in the toll gantry area to provide the future 3-lane typical section along with associated curb, guardrail and barrier walls Construct drainage improvements and associated environmental erosion control protection. Provide appropriate temporary traffic control requirements to ensure safe traffic flow during construction. Install required roadway signing and pavement markings. The contractor will be responsible for the proper removal and disposal of any surplus materials. Replace disturbed pavement, sidewalk and grass areas "in-kind" to their pre-construction conditions. The As-Built data shall be entered into an ArcGIS database consistent with the Authority's existing data format and provided to the Authority. The Contractor is responsible for all tolls incurred. Single lane closures along mainline and ramps are permitted between the hours of 9 pm - 5 am. No lane closures will be permitted during downtown special events. - Ramp detours may only be permitted between the hours of 9 pm - 5 am. No two consecutive ramps in the same direction shall be closed within the same work period. No ramp detours will be permitted during downtown special events. A Maintenance of Traffic (MOT) plan will be required in advance of lane closures for THEA's review and approval. Actual lane closure restrictions will be determined on a caseby-case basis beforehand and may need to be modified for special events, e.g., Tampa Lightning home games, Gasparilla, etc. A lane may only be closed during active work periods, and during the times noted above. All lane closures, including ramp closures, must be reported to the Authority's Project Manager and Public Information Officer a minimum of fourteen (14) calendar days prior to each closure. Also, the Contractor shall develop the Project to be able to provide for all lanes of traffic to be open in the event of an emergency.
GC Bidding
$5,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2026
November 10, 2026
1104 E Twiggs St, Tampa, FL
Related To This Project
Tampa, FL
Bid Date: Jul 22 2026
Tampa, FL
Bid Date: Aug 06 2026
Tampa, FL
--
Tampa, FL
Bid Date: Jul 23 2026
Tampa, FL
Bid Date: Aug 20 2026
Tampa, FL
Bid Date: Jul 28 2026
Tampa, FL
--
Tampa, FL
Bid Date: Sep 02 2026
Tampa, FL
Bid Date: Aug 06 2026
Tampa, FL
Bid Date: Jul 16 2026
Tampa, FL
--
Tampa, FL
Bid Date: Sep 03 2026
Tampa, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.