Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 11, 2026 at 8:00 PM
Updated August 17, 2026
Demolition, site work and renovation of a playground / park / athletic field in Milford, Pennsylvania. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; and for the renovation of a playground / park / athletic field.
The work includes but is not limited to all labor, materials, tools, equipment, oversight, permits, and inspections required for the construction of a new 2-5 playground including but not limited to site excavation and grading, demolition of items not conducive to the final design, installation of underground electrical utilities, stormwater underdrain in playground areas, concrete curb edge for safety surface, certified installation of new playground equipment and safety surfacing, installation of ADA accessible concrete walkway, prefabricated wood gazebo on gravel base, fourfoot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Construction of a new playground including site excavation, grading, demolition, underground electrical utilities, stormwater underdrain, concrete curbing, playground equipment and safety surfacing installation, ADA concrete walkway, wood gazebo, aluminum fencing, site furnishings, landscaping, and lawn restoration. Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. Deadline to submit Questions Jul 27th 2026, 3:00 PM EDT Questions may be submitted through Online. All labor, materials, tools, equipment, oversight, permits, and inspections required for the construction of a new 2-5 playground including but not limited to site excavation and grading, demolition of items not conducive to the final design, installation of underground electrical utilities, stormwater underdrain in playground areas, concrete curb edge for safety surface, certified installation of new playground equipment and safety surfacing, installation of ADA accessible concrete walkway, prefabricated wood gazebo on gravel base, four-foot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Notice of Award: August 17, 2026 Construction Commencement: September 8, 2026 Substantial Completion: November 30, 2026 Final Completion: December 31, 2026
Bid Results
$348,797.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
