Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 14, 2026

Demolition, site work and renovation of a playground / park / athletic field in Milford, Pennsylvania. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; and for the renovation of a playground / park / athletic field.

The work includes but is not limited to all labor, materials, tools, equipment, oversight, permits, and inspections required for the construction of a new 2-5 playground including but not limited to site excavation and grading, demolition of items not conducive to the final design, installation of underground electrical utilities, stormwater underdrain in playground areas, concrete curb edge for safety surface, certified installation of new playground equipment and safety surfacing, installation of ADA accessible concrete walkway, prefabricated wood gazebo on gravel base, fourfoot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Construction of a new playground including site excavation, grading, demolition, underground electrical utilities, stormwater underdrain, concrete curbing, playground equipment and safety surfacing installation, ADA concrete walkway, wood gazebo, aluminum fencing, site furnishings, landscaping, and lawn restoration. Bonds: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. Deadline to submit Questions Jul 27th 2026, 3:00 PM EDT Questions may be submitted through Online. All labor, materials, tools, equipment, oversight, permits, and inspections required for the construction of a new 2-5 playground including but not limited to site excavation and grading, demolition of items not conducive to the final design, installation of underground electrical utilities, stormwater underdrain in playground areas, concrete curb edge for safety surface, certified installation of new playground equipment and safety surfacing, installation of ADA accessible concrete walkway, prefabricated wood gazebo on gravel base, four-foot aluminum fencing, site furnishings, landscaping, and lawn restoration of disturbed areas. Notice of Award: August 17, 2026 Construction Commencement: September 8, 2026 Substantial Completion: November 30, 2026 Final Completion: December 31, 2026

Award

$348,797.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,034
Active Projects
436
Bidding Soon
5,831
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2026

September 8, 2026

Project location map

W Ann St, Milford, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed