Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2026 at 7:00 PM

Updated November 6, 2026

Site work and paving for a mixed-use development in Greenwood Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Description and Location of the Project Are as Follows: Includes Two Bridge Rehabilitations of a Non-Composite Asphalt Overlay With a Composite Concrete Deck, Two Bridge Superstructure Rehabilitations on Existing Abutments, Roadway Approaches, Guide Rail, Sidewalk, Curb, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for the Seda-Cog Bridge Rehabilitation Project in Columbia and Montour Counties Greewnwood Township, Sugarloaf Township, Stillwater Borough, and Danville Borough, Paperdale Road Site Is Approximately 0.4 Miles East of Intersection With Lower Raven Creek Road to Approximately 1.2 Miles West of Intersection With Buck Road, Columbia County, Stillwater Borough. Railroad Street Site Is Approximately 0.1 Mile Northeast of Intersection With E. Market Street to Approximately 0.2 Miles Northwest of Intersection With Walnut Street, Montour County, Danville Borough. T-312 (Sullivan Falls Road) Site Is Approximately 433 Feet Southeast of Intersection With Jamison City Road to Approximately 4.6 Miles Southwest of Intersection With Sr 487 Columbia County Sugarloaf Township. T-583 (Bottom Road) Site Is Approximately 0.8 Miles East of Intersection With Sr 4011 to Approximately 1.0 Miles West of Intersection With Sr 4037 Columbia County Greenwood Township. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 52.00% Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - Adjacent Box Beam Bridge Bundle *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$2,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
150
Bidding Soon
1,916
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2026

January 25, 2027

Project location map

Multiple Locations, Greenwood Township, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed