BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2026 at 8:00 PM

Updated July 25, 2026

Site work for a bridge / tunnel in Taber, Alberta. Completed plans call for site work for a bridge / tunnel.

BRIDGE REHABILITATION AND OTHER WORK HWY 11:10 88:18 BF 78194-1 - Carrying Hwy 88 over Bear River, 26 Km SE of Fort Vermilion PEACE REGION APPROXIMATE QUANTITIES: 130 Day Lane Closure for Bridge Construction 1 Lump Sum Traffic Accommodation for Bridge Construction 90 Square Metre Partial Depth Repair - Girder Top Flanges and Shear Keys 70 Cubic Metre Deck Overlay Concrete - Supply - Fibre-Reinforced HPC Concrete 588 Square Metre Deck Overlay Concrete - Place 29 Cubic Metre Concrete (Class HPC) - Supply and Place 48 Metre Drain Troughs 1 Lump Sum Miscellaneous Repairs Contractor to supply all materials.

GC Bidding

$5,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
8
Bidding Soon
187
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2026

October 1, 2026

Project location map

Multiple Locations, Taber, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.