Published August 3, 2026 at 8:00 PM

Updated August 12, 2026

Site work and new construction of a water / sewer project in Salina, Kansas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of 12-inch and 6-inch water mains, fire hydrants, valve assemblies, water services, and water meter pits. Includes removal and replacement of sanitary sewer main and abandonment of existing water line valves. PHASE 1 - DOVER DR o Install 12-inch (36 Linear Feet) DICL Water Main oInstall 6-inch (36 Linear Feet) DICL Water Main Install 6-inch (1,725 Linear Feet) Water Main oInstall Fire Hydrants & Valve Assemblies (2 Each) Remove Fire Hydrants & Valve Assemblies (2 Each) oInstall Resilient Gate Valves: 12-inch (1 Each); 6-inch (7 Each) oInstall Water Services: 1 " ( 17-Long, 16-Short) oRemove & Replace Private Sanitary Sewer Main: (20 Linear Feet) o Remove & Replace Sanitary Sewer Main: 8-inch (20 Linear Feet) o Abandon Existing Water Line Valves (8 Each) o Tracer Wire Connection Terminals (3 Each) o Remove and Replace Water Meter Pit, One Meter (2 Each) o Remove and Replace Water Meter Pit, Two Meters (1 Each) o Remove, Replace, and Relocate Water Meter Pit, One Meter (19 Each) oRemove, Replace, and Relocate Water Meter Pit, Two Meters (5 Each) PHASE 2-10TH AND 11TH ST o Install 6-in ( 18 Linear Feet) DICL Water Main o Install 6-inch (3,165 Linear Feet) Water Main Install Fire Hydrants & Valve Assemblies (7 Each) o Remove Fire Hydrants & Valve Assemblies (6 Each) o Install Tapping Sleeve, Valve and Valve Box ( 12" x 6") (3 Total) o Install Resilient Gate Valves: 6-inch (7 Each) o Install Water Services: 2" (1 -Long); 1.5" (14-Long); 1 " (30-Long, 38-Short) Abandon Existing Water Line Valves (9 Each) o Tracer Wire Connection Terminals (9 Each) o Remove Abandoned Meter Pit (1 Each) o Remove and Replace Water Meter Pit, One Meter (30 Each) Remove and Replace Water Meter Pit, Two Meters (8 Each) o Remove, Replace, and Relocate Water Meter Pit, One Meter (35 Each) o Remove, Replace, and Relocate Water Meter Pit, Two Meters (8 Each) PHASE 3 - LARSON ST Install 6-inch ( 18 Linear Feet) DICL Water Main Install 6-inch (750 Linear Feet) Water Main Install Fire Hydrants & Valve Assemblies (2 Each) Remove Fire Hydrants & Valve Assemblies ( 1 Each) Install Tapping Sleeve, Valve and Valve Box (8" x 6") (1 Total) Install Water Services: 1 " (11 -Long, 9-Short) Abandon Existing Water Line Valves (7 Each) Install Resilient Gate Valves : 6-inch (1 Each) Tracer Wire Connection Terminals (2 Each) Remove and Replace Water Meter Pit, One Meter (19 Each) o Remove, Replace, and Relocate Water Meter Pit, One Meter (1 Each)

Post-Bid

$1,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
42
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

October 5, 2026

Project location map

Multiple Locations, Salina, KS


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed