Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 31, 2026 at 8:00 PM
Updated August 6, 2026
Demolition, site work and new construction of a civil project in Manassas, Virginia. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for the demolition of a bridge / tunnel.
Replacement of existing pedestrian bridge and stream stabilization including construction of riffles, step pools, and log/stone structures. Work involves bank regrading, installation of erosion and sediment controls, temporary stream diversion, site grading, demolition of the existing structure, and restoration of disturbed areas with matting and native vegetation. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accommodate pedestrian and maintenance access and will be coordinated with the stream restoration to ensure long-term stability and hydraulic performance. PART A. REPLACEMENT OF EXISTING WOODEN BRIDGE Lump sum price for demolition of existing pedestrian wooden bridge, and construction of a new pedestrian bridge. Structural components include abutment, framing members, decking, railings, and connection details as specified in the structural plans. All work is to be completed in accordance with the project plans and applicable design standards. PART B.- CIVIL AND STREAM STABILIZATION Civil and stream stabilization work includes site grading, demolition, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas . The work also includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. All work is to be completed in accordance with the project plans and applicable design standards Question Deadline 08/11/2026 Bidders must so act to assure that questions reach the A/E at least six (6) days prior to the time set for the receipt of bids to allow a sufficient time for an addendum to reach all bidders before the submission of their bid
GC Bidding
$20,000,000.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 17, 2026
October 16, 2026
10950 Campus Dr, Manassas, VA
Related To This Project
Manassas, VA
Bid Date: Jul 20 2026
Manassas, VA
Bid Date: Aug 14 2026
Manassas, VA
--
Manassas, VA
Bid Date: Aug 14 2026
Manassas, VA
--
Manassas, VA
--
Manassas, VA
Bid Date: Aug 12 2026
Manassas, VA
--
Manassas, VA
--
Manassas, VA
Bid Date: Aug 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
