Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 30, 2026 at 8:00 PM

Updated October 2, 2026

Site work and new construction of a pre-engineered storage facility in Flora, Illinois. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Construction of a new maintenance shed. TIMELINE: As of September 30, 2026, construction has not yet begun. A construction start date has not been disclosed.

Final Planning

$669,215.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
40
Bidding Soon
669
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2026

January 11, 2027

Project location map

929 Stacy Burk Dr., Flora, IL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed