BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 17, 2026

Site work and paving for a mixed-use development in Juneau, Alaska. Completed plans call for site work for a military facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk and Stairs Replacement National Weather Service (NWS) Weather Forecast Office (WFO) Juneau Question Deadline 07/20/2026 at 1:00 PM AKT Time zone 2:00pm PDT. Any questions related to this notice must be submitted via FedConnect Online. The magnitude of this project is between $500,000.00 and $1,000,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The construction project will remove and replace the existing: sidewalk on the east side of the building (approximately 290 square feet), stair lower landing (approximately 40 square feet) and stair tread & riser (approximately 40 square feet) to be removed and replaced with new heated concrete stairs, landing and sidewalk. New concrete sidewalk and stairs to include electric heating with snow sensor, and new stair lighting at the National Weather Service (NWS) Weather Forecast Office (WFO) Juneau located at 8500 Mendenhall Loop Road, Juneau, AK 99801 . Demo and dispose of existing sidewalk, lower stair landing, stair tread & riser, railings, and replace. Install new lighting at stairs. Railings must be painted to match existing railing. This scope includes any required subgrade work needed to support the new sidewalk, stairs, as well as backfill, topsoil, and seeding at disturbed areas adjacent to the work. Each bidder may thoroughly examine the work area and be familiar with the SOW, drawing specifications and provided documents. The failure or neglect of a bidder to examine the site, or understand the requirements of this SOW, its attached photos, drawing specifications or any part thereof must in no way relieve it from any obligations with respect to its bid or to the resulting contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any contract document. The retaining wall is integral to the sidewalk and stairs, the integrity of the retaining wall must be preserved during the process. Refer to images 4 and 5.

Post-Bid

$1,000,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
35
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.