BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2026 at 8:00 PM

Updated July 27, 2026

Site work and renovation of a water / sewer project in Wildomar, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Corydon Well Replacement Project involves the design of a new municipal groundwater production well to replace and to abandon the existing Corydon well. The well is more than 40 years old, close to its lifetime expectancy for these types of wells, and its pumping capacity is only 25% of its original pumping capacity. The Corydon Well extracts water from Elsinore Groundwater Basin. The well will be located within the same site on Elsinore Valley Municipal Water District (EVMWD) property, utilizing the existing transmission infrastructure. The project's goal is to maintain and enhance potable groundwater water production to meet EVMWD's growing water demand. The scope of services to be provided generally includes the following: The preparation of the design, technical specifications, contract documents, and support during bidding and construction will consist of two phases: Phase 1 The design includes preparation of a set of technical specifications , civil site design drawings, and line-bid items for drilling and construction of the new well, and the abandonment of the existing Corydon Well in accordance with the Riverside County and California State Water Resources Control Board (SWRCB) requirements. Phase 1 scope includes bidding assistance and full time on-site construction management (CM) oversight. Phase 2 - the scope of work includes the preparation of technical specifications, architectural, civil, mechanical, structural, electrical, instrumentation and controls (I&C) design drawings for the Corydon Well site, and line-item bid schedule for the equipping, testing and commissioning of the new groundwater production well. Also, the Consultant will provide support during bidding and engineering services during construction of this phase. District will procure a separate firm for the Phase 2 CM services. The project is funded by multiple State and Federal grants and consultant will be responsible to adhere to grants requirements including Good Faith Effort and monthly grant reporting requirements. Question Deadline 08/25/2026 at 10:00 AM PT All questions, interpretations, or clarifications (either administrative or technical) must be requested in writing via PlanetBids under the Project's Online Question and Answer ("Q&A") tab. The existing Corydon Well site is on EVMWD property located at 31642 Corydon Street, Wildomar, CA 92595 The parcel APN is 370060051. The nearest cross street is Cereal Street. The replacement well will be located in the same existing Corydon well site. Please refer to the following Exhibits: Exhibit "1": Project Location Map for Corydon Well Existing Corydon Well Specifications & Replacement Requirements: The existing Corydon Well was built in 1983. Based on a 2010 rehabilitation project, the following details summarize the driller's log report and equipment specifications for Corydon Well: Bore hole 30 inches. Sanitary seal to a depth of 100 feet below ground surface ( ft bgs) Casing depth: 1,280 ft bgs Casing: 14-inch diameter stainless steel wire-wrapped screen o ft to 648 ft Casing: 18-inch diameter mild steel full-flo louver 648 ft to 1,243 ft Casing: Open hole at 1,280 ft Perforations from 340' - 1260 ' at 3/32" X 2 1/2" Static Water Level: Approx. 540 ft bgs Pump type: 12-inch vertical turbine; oil lubricated tube & shaft; threaded column sections Pump setting: 714 ft bgs Pump rated capacity: 1,000 gallons per minute (gpm) Pump rated total dynamic head: 738 ft Pump stages: 10 Pump motor horsepower: 300 The replacement well design shall be similar in size and closely match the existing casing depth with sanitary seal placement in accordance with current AWWA potable water well construction standards. The well casing shall be 24-inch diameter stainless steel Ful-Flo louvered well screen with specified perforations compatible with the geological formation, which will be determined during drilling of the new production well.

GC Bidding

$1,500,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
727
Active Projects
165
Bidding Soon
4,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

November 2, 2026

Project location map

31642 Corydon Rd, Wildomar, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.