BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 25, 2026

Site work for a playground / park / athletic field in Jackson, Michigan. Completed plans call for site work for a playground / park / athletic field.

Question Deadline 08/13/2026 at 12:00 PM ET Consultant shall submit all inquiries regarding this solicitation via the e-Procurement Portal Provide photos and written reports on structural evaluation of condition, construction, materials and causes of deterioration in original existing materials following practical, professional standards to ensure responsible, ethical, and well-documented preservation of cultural heritage in accordance with AIC of Historic and Artistic Works' Code of Ethics and Guidelines for Practice and the Secretary of the Interiors Standards for Preservation. NOTE: PHOTOS OF ALL 4 SIDES OF THE MONUMENT ARE INCLUDED UNDER "ATTACHMENTS" 2. Conservation Treatments & Compliance Requirements Cleaning, repair, stabilization, and preservation of original materials using proper cleaning solutions, portable sprayer pump, and proper health and safety eyewear and gloves. According to AIC Guidelines for Practice, high -pressure washers, stiff or metal bristle brushes, and bleach may cause irreparable damage and are prohibited use. Contractor may need to bring clean water to site for proper rinsing and cleaning. Treatment standards should use minimal intervention, provide reversibility, if possible, avoid altering original meaning or evidence, use tested and stable materials, and preserve historical, cultural, and physical integrity. Any possible alterations must be approved by the City of Jackson prior to commencement of work. 3. Restoration Work Repair of damaged architectural elements, stonework, metalwork, or inscriptions. Repointing of any missing or deteriorated mortar should be replaced to prevent water intrusions and potential damage. The repointing of mortar joints should utilize new mortar to match original historic mortar color and composition (lime/sand ). Inappropriate mortar such as bathtub caulk or silicone sealants is prohibited . All work and materials used must follow AIC of Historic and Artistic Works' Code of Ethics and Guidelines for Practice and meet the Secretary of the Interiors Standards for Preservation, as well as adherence to federal , state, and local preservation standards. NOTE: Any structural integrity or instability findings must be in collaboration with a City of Jackson qualified and approved engineering firm , prior to any related work performed. 4. Project Completion Documentation for Archiving Upon project completion, the Contractor shall provide detailed photographs and a complete report documenting all methods, materials, and rationale used to complete the project. Preventative conservation and routine maintenance care procedures must be included in this report for responsible care and a long-term preservation plan.

Post-Bid

$2,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
213
Bidding Soon
2,584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

October 19, 2026

Project location map

400 W Michigan Ave, Jackson, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.