BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 26, 2026 at 8:00 PM

Updated July 30, 2026

Demolition, site work and paving for a sidewalk / parking lot in Plymouth, Wisconsin. Completed plans call for the demolition of a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Demolition of the existing asphalt wear layer at the south and north parking lots. Work includes storm sewer structures work at two central catch basins and 2 in-curb catch basins to raise to align with new finished asphalt and/or new concrete curb sections. Includes parking and ADA striping and post signage. Bonds: 5% Bid Bond. Question Deadline 08/12/2026 Any prospective bidder desiring an explanation or interpretation of the solicitation , specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening.

GC Bidding

$2,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
90
Bidding Soon
1,825
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2026

September 1, 2026

Project location map

1214 Reed St, Plymouth, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.