Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 21, 2026 at 8:00 PM
Updated July 24, 2026
Site work and renovation of a fire / police facility in Marion, Ohio. Completed plans call for the renovation of a fire / police facility; and for site work for a fire / police facility.
Well system plumbing, filtration upgrades, water heater replacement, and water fountain replacement including replacing pressure tanks and installing whole-house filtration systems at an Ohio State Highway Patrol facility. Deadline 07/21/2026 10:00 AM EDT Bonds: Other Bond required (unspecified amount). More Info: Mike Morehouse, MDMorehouse@dps.ohio.gov Any questions regarding project scope or bid process please contact: Donna Wood Planner, Ohio Department Public Safety 1970 West Broad Street, Suite 428 Columbus, Oh 43223 DLWood@dps.ohio.gov Well System Plumbing, Filtration Upgrades, Water Heater Replacement, and Water Fountain Replacement The Marion Ohio State Highway Patrol Post 51 operates on a well water source with all plumbing located in the basement and utilizing copper supply lines. The following work is required: 1 ) Shut-Off Valve Replacement (a) Replace all existing shut-off valves on the well system plumbing in the basement. (b) Verify valve locations and ensure compatibility with the existing copper piping. 2) Sediment Pre-Filter Replacement (a) Remove the existing sediment pre-filter. (b) Install a new sediment pre-filter sized appropriately for system flow requirements (vendor to verify onsite). 3) Pressure Tank Replacement (a) Remove and dispose of the existing pressure tank. (b) Install a new pressure tank properly sized for the well pump and building demand. 4) Holding Tank Replacement (a) Remove the existing 30-50 gallon holding tank. (b) Install a new holding tank; vendor to verify required capacity during onsite assessment. 5) Whole-House Filtration System Installation (a) Install two (2) whole-house filtration units: (i) Manganese filtration system; and (ii) Hydrogen sulfide filtration system (b) Ensure proper bypass valves, drainage connections, and integration into the existing copper plumbing. 6) Brine Tank Installation (a) Install one (1 ) new 50- lb brine tank for water conditioning operations. (b) Verify brine line and operational settings after installation. 7) Inline Post-Filter Installation (a) Install one (1 ) (2-stage whole house) inline post-filter downstream of the treatment systems for final water polishing for the post to use. 8) 50-Gallon Hot Water Heater Replacement (a) Remove and dispose of the existing 50-gallon hot water heater. (b) Install a new 50-gallon hot water heater (vendor to verify exact model and capacity requirements onsite). (c) Connect to existing hot and cold supply lines, temperature/pressure relief discharge, and electrical or gas service as applicable. (d) Test operation for proper heating, pressure control , and leak-free performance. 9) Water Fountain Removal and Replacement (a) Remove and dispose of the existing wall-mounted drinking fountain. (b) Install a new wall-mounted drinking fountain with an integrated bottle-filling station. (c) Connect to existing supply and drain lines; verify proper mounting height, anchoring, and plumbing alignment. (d) Test flow, bottle filler operation, and cooling function (if equipped). 10) System Testing & Commissioning (a) Inspect all installed components for leaks, pressure stability, proper flow rates, and full system functionality. (b) Confirm all filtration units, tanks, heaters, shutoffs , and fixtures are operating as intended. 11 ) Miscellaneous (a) Supply the facility with One (1) years' worth of water filters (b) Project hours are normal business operations: 7:00 a.m. to 5:00 p.m. (c) Background checks will be performed for employees working onsite (d) Post is a 24/7 operation. If necessary, plan according with the facility on when shutting down the water and how long during tear out phase and connecting phase
Sub-Bidding
$1,500,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2026
September 22, 2026
2284 Marion-Upper Sandusky Rd, Marion, OH
Related To This Project
Marion, OH
Bid Date: Jul 21 2026
Marion, OH
--
Marion, OH
--
Marion, OH
--
Marion, OH
--
Marion, OH
Bid Date: Apr 23 2026
Marion, OH
Bid Date: Jun 01 2026
Marion, OH
Bid Date: May 21 2026
Marion, OH
--
Marion, OH
Bid Date: May 19 2026
Marion, OH
--
Marion, OH
--
Marion, OH
Bid Date: May 14 2026
Marion, OH
Bid Date: May 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
