BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 27, 2026 at 8:00 PM

Updated July 28, 2026

Site work, new construction and renovation of a municipal facility in New York, New York. Completed plans call for the renovation of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Kitchen renovation services involving labor, materials, and equipment procurement in accordance with project specifications and prevailing wage requirements. This is a NYS Public Works project and prevailing wages are to be paid. (Kitchen Renovation) The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid . Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of Kitchen Renovation installation, before removal of equipment and scaffolding , contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: Kitchen Renovation: Cover all Smoke Detector heads throughout the working areas. Demolition of entire kitchen and removal of all debris daily. All studs must be exposed for CEO or DDSO officiate for inspection if they are rotted. All work to cease till Scope of Work and Quote for new materials are produced. Sink drain connections to be supplied new to stack. (cast iron as required, no PVC) Sink, and all drain lines to be vented according to NYS Plumbing Code. All flooring to be removed to substrate for CEO or DDSO officiate for inspection and if floor is buckled or sloped removal of that area to inspect floor joists and beams for corrections. All work to cease till Scope of Work and Quote for new materials are produced. Solid wood cabinet colors as specified. (Attached) Cabinet hinges as specified in Design. (satin) A visual inspection of opened walls and demo'ed areas must be completed before any install of new GWB is performed. (See above for change orders) A visual inspection of all wall insulation to take place after the demo of walls. Replace as necessary. A PRE visual inspection of all electrical components, plumbing lines, drain lines and beams must be performed prior to re installation of new materials. (See above for change orders) Question Deadline 08/06/2026 Any vendor questions not asked during the site visit must be submitted in writing to: Brooklyn.CMM.Bids@opwdd.ny.gov

Sub-Bidding

$50,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,220
Active Projects
321
Bidding Soon
8,609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

September 14, 2026

Project location map

1025 E 167th St, New York, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.